Summarised outcomes of published short and standard SEND inspection reports by Ofsted, refreshed daily.
An expanded version of the shown summary sheet, refreshed concurrently, is available to
download here as an .xlsx file.
Data summary is based on the original SEND Outcomes Summary published periodically by the ADCS:
https://www.adcs.org.uk/inspection-of-childrens-services/.
Disclaimer: This summary is built from scraped data direct from
https://reports.ofsted.gov.uk/ published PDF inspection report files.
Nuanced | variable inspection report content, structure, and PDF encoding occasionally result in problematic data extraction for a small number of LAs.
Known extraction issues:
Summary data last updated: 22 04 2025 06:09
LA inspections last updated: []
URN | La Code | Region Code | LTLA23CD | Local Authority | Previous Inspection Date | Inspection Start Date | Inspection End Date | Outcome Grade | Inspection Outcome Text | Publication Date | Next Inspection | Next Inspection By Date | Inspection Link |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
80428 | 822 | E | E06000055 | bedford | 01/01/1900 | 18/11/24 | 22/11/24 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. | 04/02/25 | 5 years | 18/11/29 | ofsted.gov.uk/50268244 |
80431 | 890 | NW | E06000009 | blackpool | 01/01/1900 | 20/05/24 | 24/05/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 25/07/24 | 3 years | 20/05/27 | ofsted.gov.uk/50253401 |
80432 | 350 | NW | E08000001 | bolton | 27/05/2016 | 17/06/24 | 21/06/24 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. | 30/08/24 | 5 years | 17/06/29 | ofsted.gov.uk/50255791 |
80436 | 867 | SE | E06000036 | bracknell forest | 01/01/1900 | 03/02/25 | 07/02/25 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, His Majesty’s Chief Inspector (HMCI) requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 01/04/25 | 18 months | 03/08/26 | ofsted.gov.uk/50273313 |
80438 | 846 | SE | E06000043 | brighton and hove | 01/01/1900 | 27/03/23 | 31/03/23 | 1 | The local area partnership’s arrangements typically lead to positive experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership is taking action where improvements are needed. The next full Area SEND inspection will be within approximately 5 years. | 31/05/23 | 5 years | 27/03/28 | ofsted.gov.uk/50218659 |
80443 | 351 | NW | E08000002 | bury | 15/05/2019 | 12/02/24 | 16/02/24 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, HMCI requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 07/05/24 | 18 months | 12/08/25 | ofsted.gov.uk/50246030 |
80451 | 384 | YH | E08000036 | wakefield | 01/01/1900 | 18/03/24 | 22/03/24 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. | 26/07/24 | 5 years | 18/03/29 | ofsted.gov.uk/50253460 |
80454 | 908 | SW | E06000052 | cornwall | 07/07/2017 | 06/02/23 | 10/02/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. | 05/05/23 | 3 years | 06/02/26 | ofsted.gov.uk/50215730 |
80458 | 841 | NE | E06000005 | darlington | 28/01/2022 | 25/11/24 | 29/11/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and the Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 04/02/25 | 3 years | 25/11/27 | ofsted.gov.uk/50268246 |
80460 | 830 | EM | E10000007 | derbyshire | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, His Majesty’s Chief Inspector requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 14/11/24 | 18 months | Last inspection date not provided | ofsted.gov.uk/50261625 | |||
2532283 | 838 | SW | E10000009 | dorset | 27/01/2017 | 11/03/24 | 15/03/24 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. | 15/05/24 | 5 years | 11/03/29 | ofsted.gov.uk/50246984 |
80464 | 332 | WM | E08000027 | dudley | 01/01/1900 | 20/01/25 | 24/01/25 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 11/03/25 | 3 years | 20/01/28 | ofsted.gov.uk/50271042 |
80465 | 840 | NE | E06000047 | durham | 01/01/1900 | 24/06/24 | 28/06/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 03/09/24 | 3 years | 24/06/27 | ofsted.gov.uk/50255956 |
80467 | 845 | SE | E10000011 | east sussex | 09/12/2016 | 18/11/24 | 22/11/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 04/02/25 | 3 years | 18/11/27 | ofsted.gov.uk/50268245 |
80469 | 390 | NE | E08000037 | gateshead | 10/02/2017 | 22/05/23 | 26/05/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 24/07/23 | 3 years | 22/05/26 | ofsted.gov.uk/50224180 |
80470 | 916 | SW | E10000013 | gloucestershire | 01/01/1900 | 11/12/23 | 15/12/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 01/03/24 | 3 years | 11/12/26 | ofsted.gov.uk/50240683 |
80471 | 876 | NW | E06000006 | halton | 31/03/2017 | 20/11/23 | 24/11/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, His Majesty’s Chief Inspector requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 26/01/24 | 18 months | 20/05/25 | ofsted.gov.uk/50238390 |
80473 | 805 | NE | E06000001 | hartlepool | 07/10/2016 | 13/03/23 | 17/03/23 | 1 | The local area partnership’s arrangements typically lead to positive experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately 5 years. Ofsted and the CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 16/05/23 | 5 years | 13/03/28 | ofsted.gov.uk/50216721 |
80474 | 884 | WM | E06000019 | herefordshire | 30/09/2016 | 02/12/24 | 06/12/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 07/02/25 | 3 years | 02/12/27 | ofsted.gov.uk/50268466 |
80475 | 919 | E | E10000015 | hertfordshire | 08/07/2016 | 10/07/23 | 14/07/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately 3 years. | 10/11/23 | 18 months | 10/01/25 | ofsted.gov.uk/50232445 |
80477 | 810 | YH | E06000010 | kingston upon hull | 17/10/2019 | 20/11/23 | 24/11/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and the Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 02/02/24 | 3 years | 20/11/26 | ofsted.gov.uk/50238910 |
80480 | 888 | NW | E10000017 | lancashire | 01/01/1900 | 09/12/24 | 13/12/24 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, His Majesty’s Chief Inspector requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 12/02/25 | 18 months | 09/06/26 | ofsted.gov.uk/50268954 |
80486 | 301 | GL | E09000002 | barking and dagenham | 31/03/2017 | 08/07/24 | 12/07/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 06/09/24 | 3 years | 08/07/27 | ofsted.gov.uk/50256050 |
80488 | 303 | GL | E09000004 | bexley | 01/01/1900 | 04/12/23 | 08/12/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. | 23/02/24 | 18 months | 04/06/25 | ofsted.gov.uk/50240171 |
80489 | 304 | GL | E09000005 | brent | 19/05/2017 | 27/01/25 | 31/01/25 | 1 | The local area partnership’s special educational needs and/or disability (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately 5 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 27/03/25 | 5 years | 27/01/30 | ofsted.gov.uk/50272928 |
80494 | 308 | GL | E09000010 | enfield | 01/01/1900 | 20/03/23 | 24/03/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will take place within approximately 3 years. Ofsted and the CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 02/08/23 | None | Next inspection time frame not found | ofsted.gov.uk/50225063 |
80495 | 203 | GL | E09000011 | greenwich | 14/07/2017 | 11/05/23 | 19/05/23 | 1 | The local area partnership’s special educational needs and/or disability (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately 5 years. | 11/07/23 | 5 years | 11/05/28 | ofsted.gov.uk/50222861 |
80498 | 309 | GL | E09000014 | haringey | 01/01/1900 | 29/01/24 | 02/02/24 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. | 03/04/24 | 5 years | 29/01/29 | ofsted.gov.uk/50243302 |
80501 | 312 | GL | E09000017 | hillingdon | 01/01/1900 | 29/04/24 | 03/05/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 12/07/24 | 3 years | 29/04/27 | ofsted.gov.uk/50252397 |
80503 | 313 | GL | E09000018 | hounslow | 01/01/1900 | 21/10/24 | 25/10/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 18/12/24 | 3 years | 21/10/27 | ofsted.gov.uk/50264793 |
80508 | 209 | GL | E09000023 | lewisham | 06/10/2017 | 23/09/24 | 27/09/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 20/11/24 | 3 years | 23/09/27 | ofsted.gov.uk/50262087 |
80511 | 316 | GL | E09000025 | newham | 10/12/2021 | 07/10/24 | 11/10/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 28/11/24 | 3 years | 07/10/27 | ofsted.gov.uk/50262991 |
80513 | 318 | GL | E09000027 | richmond upon thames | 18/06/2021 | 02/10/23 | 06/10/23 | 1 | The local area partnership’s special educational needs and/or disability (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately 5 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 04/12/23 | 5 years | 02/10/28 | ofsted.gov.uk/50234459 |
80517 | 320 | GL | E09000031 | waltham forest | 27/01/2017 | 10/02/25 | 14/02/25 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and the Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 01/04/25 | 3 years | 10/02/28 | ofsted.gov.uk/50273312 |
80522 | 887 | NaN | E06000035 | medway | 11/12/2019 | 05/02/24 | 09/02/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 02/04/24 | 3 years | 05/02/27 | ofsted.gov.uk/50243176 |
80523 | 806 | NE | E06000002 | middlesbrough | 10/07/2019 | 09/10/23 | 13/10/23 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. Ofsted and Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan, based on the recommendations set out in this report. | 08/12/23 | 5 years | 09/10/28 | ofsted.gov.uk/50234957 |
80524 | 826 | SE | E06000042 | milton keynes | 12/10/2018 | 04/03/24 | 08/03/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 20/05/24 | 3 years | 04/03/27 | ofsted.gov.uk/50247473 |
2637539 | 940 | EM | E06000061 | north northamptonshire | 01/01/1900 | 22/01/24 | 26/01/24 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. | 25/03/24 | 18 months | 22/07/25 | ofsted.gov.uk/50242696 |
80530 | 815 | YH | E10000023 | north yorkshire | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 25/09/24 | 3 years | Last inspection date not provided | ofsted.gov.uk/50257830 | |||
80534 | 891 | EM | E10000024 | nottinghamshire | 24/06/2016 | 30/01/23 | 03/02/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND) which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full area SEND inspection will take place within approximately 3 years. HMCI requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 16/05/23 | 18 months | 30/07/24 | ofsted.gov.uk/50216722 |
80535 | 353 | NW | E08000004 | oldham | 06/10/2017 | 26/06/23 | 30/06/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately 3 years. As a result of this inspection, HMCI requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 29/08/23 | 18 months | 26/12/24 | ofsted.gov.uk/50226808 |
80536 | 931 | SE | E10000025 | oxfordshire | 17/10/2019 | 13/07/23 | 21/07/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately 3 years. | 15/09/23 | 18 months | 13/01/25 | ofsted.gov.uk/50228374 |
80538 | 879 | SW | E06000026 | plymouth | 14/10/2016 | 26/06/23 | 30/06/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately 3 years. | 22/08/23 | 18 months | 26/12/24 | ofsted.gov.uk/50226534 |
80543 | 372 | YH | E08000018 | rotherham | 01/01/1900 | 30/09/24 | 04/10/24 | 1 | The local area partnership’s special educational needs and/or disabilities (SEND) arrangements typically lead to positive experiences and outcomes for children and young people with SEND. The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within approximately five years. | 14/11/24 | 5 years | 30/09/29 | ofsted.gov.uk/50261626 |
80547 | 857 | EM | E06000017 | rutland | 14/07/2017 | 15/05/23 | 19/05/23 | 1 | The local area partnership’s arrangements typically lead to positive experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership is taking action where improvements are needed. The next full Area SEND inspection will be within approximately 5 years. | 03/08/23 | 5 years | 15/05/28 | ofsted.gov.uk/50225252 |
80549 | 333 | WM | E08000028 | sandwell | 21/03/2019 | 03/07/23 | 07/07/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. | 12/09/23 | 3 years | 03/07/26 | ofsted.gov.uk/50227802 |
80558 | 852 | SE | E06000045 | southampton | 01/01/1900 | 13/05/24 | 17/05/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and the Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 16/07/24 | 3 years | 13/05/27 | ofsted.gov.uk/50252575 |
80559 | 882 | E | E06000033 | southend-on-sea | 06/10/2018 | 06/03/23 | 10/03/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. Ofsted and the Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 09/06/23 | 3 years | 06/03/26 | ofsted.gov.uk/50219405 |
80564 | 861 | WM | E06000021 | stoke-on-trent | 15/07/2016 | 29/01/24 | 02/02/24 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 03/04/24 | 3 years | 29/01/27 | ofsted.gov.uk/50243303 |
80565 | 935 | E | E10000029 | suffolk | 23/01/2019 | 13/11/23 | 17/11/23 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, His Majesty’s Chief Inspector requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 30/01/24 | 18 months | 13/05/25 | ofsted.gov.uk/50238584 |
80567 | 936 | SE | E10000030 | surrey | 21/03/2019 | 25/09/23 | 29/09/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. | 24/11/23 | 3 years | 25/09/26 | ofsted.gov.uk/50233738 |
80570 | 894 | WM | E06000020 | telford & wrekin | 26/05/2017 | 20/03/23 | 24/03/23 | 1 | The local area partnership’s arrangements typically lead to positive experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership is taking action where improvements are needed. The next full Area SEND inspection will be within approximately 5 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 03/07/23 | 5 years | 20/03/28 | ofsted.gov.uk/50221953 |
80573 | 358 | NW | E08000009 | trafford | 01/01/1900 | 16/10/23 | 20/10/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. | 22/12/23 | 3 years | 16/10/26 | ofsted.gov.uk/50236174 |
80575 | 877 | NW | E06000007 | warrington | 14/12/2018 | 06/02/23 | 10/02/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately 3 years. Ofsted and CQC ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 05/05/23 | 3 years | 06/02/26 | ofsted.gov.uk/50215729 |
2637548 | 941 | EM | E06000062 | west northamptonshire | 01/01/1900 | 18/03/24 | 22/03/24 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. | 12/07/24 | 18 months | 18/09/25 | ofsted.gov.uk/50252240 |
80578 | 938 | SE | E10000032 | west sussex | 01/01/1900 | 27/11/23 | 01/12/23 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. | 29/02/24 | 3 years | 27/11/26 | ofsted.gov.uk/50240577 |
2733698 | 943 | NW | E10000006 | westmorland and furness | 01/01/1900 | 03/02/25 | 07/02/25 | 2 | The local area partnership’s arrangements lead to inconsistent experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership must work jointly to make improvements. The next full area SEND inspection will be within approximately three years. Ofsted and Care Quality Commission (CQC) ask that the local area partnership updates and publishes its strategic plan based on the recommendations set out in this report. | 09/04/25 | 3 years | 03/02/28 | ofsted.gov.uk/50274229 |
80580 | 865 | SW | E06000054 | wiltshire | 01/01/1900 | 14/10/24 | 18/10/24 | 1 | The local area partnership’s arrangements typically lead to positive experiences and outcomes for children and young people with special educational needs and/or disabilities (SEND). The local area partnership is taking action where improvements are needed. The next full area SEND inspection will be within five years. | 06/12/24 | None | Next inspection time frame not found | ofsted.gov.uk/50263759 |
80581 | 344 | NW | E08000015 | wirral | 01/01/1900 | 27/01/25 | 31/01/25 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. As a result of this inspection, His Majesty’s Chief Inspector (HMCI) requires the local area partnership to prepare and submit a priority action plan (area SEND) to address the identified areas for priority action. | 16/04/25 | 18 months | 27/07/26 | ofsted.gov.uk/50274678 |
80584 | 885 | WM | E10000034 | worcestershire | 03/11/2021 | 22/04/24 | 26/04/24 | 3 | There are widespread and/or systemic failings leading to significant concerns about the experiences and outcomes of children and young people with special educational needs and/or disabilities (SEND), which the local area partnership must address urgently. A monitoring inspection will be carried out within approximately 18 months. The next full reinspection will be within approximately three years. | 15/07/24 | 18 months | 22/10/25 | ofsted.gov.uk/50252437 |